Workshop Update for May 31st, 2012

Posted on Thursday, May 31st, 2012 in Workshop Update by DP

Today we made a video of the Get your Stuff Made presentation. We also worked on cleaning up the Bus Blaster v2/3/4 buffer logic.

Design of the badge for New York Maker Faire started in full. It has options for through-hole or various surface mount part sizes. The picture above is of the latest design.

Part Ninja firmware is moving along. Today we fixed an error with triac recognition. We also made an app with Processing, that retrieves the latest test information and copies it into the clipboard. It works even when the app is in the background, making it easy to post bug reports in the forum.

This entry was posted on Thursday, May 31st, 2012 at 11:00 pm and is filed under Workshop Update. You can follow any responses to this entry through the RSS 2.0 feed. You can skip to the end and leave a response. Pinging is currently not allowed.

2 Responses to “Workshop Update for May 31st, 2012”

  1. Juha Lumme says:

    The link for the video is truncated…
    In the meantime, looks like you can find it here:

Leave a Reply

Notify me of followup comments via e-mail. You can also subscribe without commenting.

Recent Comments